SCHEDULING

Rotating Shift Schedule Examples: 2-2-3, DuPont, Pitman, 4-on-4-off and Weekly Rotation

Worked examples of the most common rotating shift patterns with crew counts, average weekly hours, week-by-week tables, advantages and drawbacks, and how each pattern fits the 48-hour week, weekly-off and spread-over rules that apply in India.

Rotating shift schedule showing four crews cycling through day, night and off blocks

What a Rotating Shift Schedule Has to Solve

A rotating shift schedule moves employees through different shift times over a cycle instead of fixing one person permanently on nights. The reasons are practical: nobody wants the permanent night slot, skills need to be spread across all shifts, and the law requires every worker to get a weekly rest day even though the plant or post never closes. The pattern you choose decides how many crews you need, how many hours each person averages, and how often they get a full weekend.

Two numbers drive every pattern. Coverage hours per week for one post that runs 24×7 is 168. If shifts are 8 hours, that is 21 shifts a week; if 12 hours, 14 shifts. Divide by the number of shifts one person can legally and sensibly work in a week and you get the crew count. In India the ceiling is 48 hours a week under the Factories Act and most state Shops and Establishments Acts, with daily limits of 9 hours (some states allow more under recent amendments) and a spread-over of 10.5 hours in factories. Anything beyond that is overtime at double rate, or needs a specific exemption.

The patterns below are written for one post. Multiply by the number of posts or machines that need simultaneous coverage. A single security post on 12-hour duties needs 4 guards on a 4-crew pattern; a 3-post site needs 12, plus a relief allowance for leave. The glossary entry on rotational shifts covers the terminology if your supervisors use different words for the same thing.

  • 168 hours a week per post is the fixed quantity every pattern must cover
  • Crew count = weekly shifts ÷ shifts one person can work per week
  • India: 48 hours a week, weekly rest day, daily limit and spread-over apply
  • Choose the pattern per post type, then multiply by post count

Example 1: Weekly Forward Rotation on 8-Hour Shifts (Three Crews Plus Relief)

This is the classic Indian factory pattern: A shift 06:00–14:00, B shift 14:00–22:00, C shift 22:00–06:00. Each crew works one shift for a week, takes its weekly off, then moves forward: morning → evening → night. Forward rotation (delaying the body clock) is easier on sleep than backward rotation. Three crews cover the three shifts, and a fourth relief crew (or a relief allowance of about half a person per post) covers weekly offs.

Sample three weeks for Crew A with a Sunday off: Week 1, Mon–Sat 06:00–14:00, Sun off (48 hours). Week 2, Mon–Sat 14:00–22:00, Sun off (48 hours). Week 3, Mon–Sat 22:00–06:00, Sun off (48 hours). Crews B and C follow one and two weeks behind. Because the crews rotate on the same day, the Sunday-night to Monday-morning changeover needs care: the crew leaving nights on Saturday 06:00 and starting mornings on Monday 06:00 has 48 hours of rest, which is fine; a crew leaving nights at 06:00 Sunday and starting evenings Monday 14:00 also works. Avoid any sequence where the gap between two shifts is under 12 hours.

Weekly hours are exactly 48, so there is no built-in overtime and the weekly-off rule is met in every week. The drawback is six consecutive working days and a constant Sunday off only if the relief crew covers Sundays; in 24×7 sites the weekly off usually rotates across the week instead. The full staffing formula and handover practice are in 3-shift roster patterns.

  • Crews: 3 working plus relief; shifts 8 hours; cycle 3 weeks
  • Average weekly hours: 48, no structural overtime
  • Weekly off: one fixed or rotating day every week (compliant)
  • Best for: factories, hospitals, plants with a general shift culture

Example 2: The 2-2-3 (Panama or Pitman) Schedule on 12-Hour Shifts

The 2-2-3 pattern (also called Panama; the Pitman schedule is the same day-count pattern) uses four crews on 12-hour shifts over a 14-day cycle. Each crew works 2 on, 2 off, 3 on, 2 off, 2 on, 3 off. Two crews cover days (08:00–20:00) and two cover nights (20:00–08:00), and the crews typically swap day and night every two or four weeks. Its appeal is that every second weekend is a three-day weekend, and no one works more than three days in a row.

Sample two weeks for Crew A on days: Week 1, Mon–Tue on, Wed–Thu off, Fri–Sun on (5 shifts, 60 hours). Week 2, Mon–Tue off, Wed–Thu on, Fri–Sun off (2 shifts, 24 hours). Crew B is the mirror image on days; Crews C and D repeat the pair on nights. Over 14 days each person works 7 shifts, an average of 42 hours a week, but the two weeks are unequal: 60 hours then 24 hours.

That 60-hour week is the Indian compliance problem. The Factories Act limit is 48 hours in any week, not on average, and 12 hours of work a day exceeds the 9-hour daily limit unless the state has notified an exemption or amendment permitting 12-hour shifts within a 48-hour week. Security agencies operating under state Shops and Establishments rules face the same issue. In practice, employers who run 2-2-3 either treat hours beyond 9 a day and 48 a week as overtime at double rate, or operate under a state exemption with the conditions it imposes. The detail is in 12-hour shift schedules for 24/7 coverage.

  • Crews: 4; shifts 12 hours; cycle 14 days; 7 shifts per person per cycle
  • Average weekly hours: 42, but alternating 60-hour and 24-hour weeks
  • Every other weekend is a 3-day weekend; max 3 consecutive shifts
  • India: the 60-hour week and 12-hour day need OT payment or a state exemption

Example 3: The DuPont Schedule (Four Crews, Four-Week Cycle)

DuPont also uses four crews on 12-hour shifts, but over a 28-day cycle: 4 nights on, 3 off, 3 days on, 1 off, 3 nights on, 3 off, 4 days on, 7 off. The reward is a full week off every four weeks. The cost is one 72-hour week in every cycle, which is heavy on fatigue and, in India, well beyond the weekly limit without exemption.

Sample cycle for Crew A: Week 1, Mon–Thu nights, Fri–Sun off (48 hours). Week 2, Mon–Wed days, Thu off, Fri–Sun nights (72 hours). Week 3, Mon–Wed off, Thu–Sun days (48 hours). Week 4, entirely off (0 hours). Average 42 hours a week, four crews staggered by a week each.

DuPont suits continuous-process plants where crews are stable and the culture accepts long weeks in exchange for a whole week off. It is a poor fit for security posts or hospitals where leave and no-shows are frequent, because a single absence in the 72-hour week is very hard to cover. Most Indian employers who like the seven-day break run a modified version with shorter blocks and pay overtime on any day over 9 hours.

  • Crews: 4; shifts 12 hours; cycle 28 days
  • Weekly hours: 48, 72, 48, 0; average 42
  • One full week off every four weeks
  • India: 72-hour week requires OT at double rate or an exemption; fatigue risk is high

Example 4: 4-on-4-off and Fixed Day/Night Crews

The 4-on-4-off pattern runs four crews on 12-hour shifts over an 8-day cycle: four consecutive shifts followed by four days off. Two crews are on days and two on nights, or crews alternate between 4 days and 4 nights. Because the cycle is 8 days and the week is 7, weekly hours drift: some weeks contain 4 shifts (48 hours), others 3 (36 hours) or, occasionally, 5 (60 hours) depending on where the week boundary falls. The average is 42.

Sample for Crew A starting Monday: Mon–Thu on (48 hours), Fri–Mon off, Tue–Fri on, Sat–Tue off, and so on. The pattern is easy to remember and popular with security agencies and hotels because every crew always knows its next four days. Four consecutive 12-hour nights are tiring, though, and the days-off block often lands mid-week, so weekends are irregular.

Fixed day and night crews (no rotation) are the simplest of all: two crews on permanent days and two on permanent nights, each working a 2-2-3 or 4-4 day pattern. It suits operations where some employees prefer nights for family reasons and are paid a night allowance for it. The trade-off is that night crews rarely see managers or training, and the OSH Code's free annual health check for workers over 40 becomes more important for a permanent night crew. Night allowance structures are covered in night shift allowance policy.

  • 4-on-4-off: 4 crews, 8-day cycle, average 42 hours, weekly hours vary 36–60
  • Very predictable; weekends irregular; four nights in a row is fatiguing
  • Fixed day/night crews: no rotation, needs night allowance and health monitoring
  • Both need OT treatment for any day over the daily limit in India

Choosing a Pattern for an Indian Operation

Start with the legal frame, not the pattern. If your unit is a factory without a state exemption for 12-hour shifts, the weekly forward rotation on 8-hour shifts is the only pattern above that stays within 9 hours a day and 48 a week without overtime. If your state has notified 12-hour working with a 48-hour weekly cap, or you are prepared to pay double-rate overtime for hours beyond the limit, the 12-hour patterns become options. Check working hours as per labour law in India for the current position and where to verify your state's rules.

Then weigh the operational factors: how often people are absent (12-hour patterns with small crews are fragile), whether weekends matter to your workforce (2-2-3 wins), whether your staff commute long distances (fewer, longer shifts reduce commute days), and whether the work is physically or mentally demanding (8-hour shifts are safer). Write down the average weekly hours and the maximum week for each candidate and put them beside your overtime budget.

Whatever you choose, the pattern only works if the roster, leave and attendance agree. A crew member on approved leave must be visibly missing from the roster before the week starts, a swap between crews must be approved rather than announced, and the punch time must be compared with the assigned shift every day. Attend Mitra's shift management supports rotating and midnight-crossing shift templates, roster presets for patterns like these, warnings when someone on leave is rostered, and swap approvals, so the pattern you designed is the one that actually runs. For a hands-on walkthrough of running rotation month after month, see how to manage rotating rosters, and pick up the 12-hour shift schedule template if you want to model these cycles in Excel first.

  • Confirm the legal daily and weekly limits for your establishment first
  • Compare average hours, maximum week, weekend frequency and fatigue
  • Model absenteeism: small 12-hour crews break faster than 8-hour crews
  • Enforce the pattern through roster, leave and attendance working together

Frequently Asked Questions

What is a 2-2-3 rotating shift schedule?
A 14-day pattern on 12-hour shifts where each of four crews works 2 days, rests 2, works 3, rests 2, works 2 and rests 3. Two crews cover days and two cover nights. Each person works 7 shifts in 14 days, averaging 42 hours a week, and gets a three-day weekend every other week.
What is the difference between Pitman and DuPont schedules?
Pitman is the 2-2-3 day-count pattern over a 14-day cycle, with weekly hours of 60 and 24 alternating. DuPont runs over 28 days with blocks of 4 nights, 3 days, 3 nights and 4 days, giving a full week off but also one 72-hour week per cycle. Both use four crews and average 42 hours.
Are 12-hour rotating shifts legal in India?
The Factories Act caps work at 9 hours a day and 48 a week with a 10.5-hour spread-over; hours beyond that are overtime at twice the ordinary rate. Several states have notified amendments or exemptions allowing 12-hour shifts within a 48-hour week. Check your state's notification and pay overtime where limits are exceeded.
How many employees do I need for a rotating 24/7 schedule?
For one post: 3 crews plus relief on 8-hour shifts (about 3.5 to 4 people), or 4 crews on 12-hour shifts. Multiply by the number of simultaneous posts and add 10 to 15 percent for leave and absenteeism. Small crews on 12-hour patterns need a larger relief pool because one absence removes a quarter of the crew.
Which rotating shift pattern is best for security guards?
Most Indian agencies run 12-hour day and night duties, so 4-on-4-off or 2-2-3 with four guards per post are common, with weekly offs rotated by the supervisor. Where the client or state rules require 8-hour duties, a three-crew weekly rotation with a relief guard per two posts is used instead.